Archive

For the first time in the United States, an airline terminal was unitized and fabricated off site while the UG utilities and piers were being installed on site in an accelerated concourse delivery system. The High C gates had constraints on four sides that required...

CESG installed the electrical components needed for this highly advanced electromagnetic energy company....

CESG was responsible for the electrical installation at this luxury high-rise in the prestigious...

Efficient design is critical as data centers consume up to 50 times the energy per floor of a commercial...

This ground-up, world-class live music venue, bar and restaurant sports an impressive retractable roof...

CESG fast-tracked The Speedway Club, a multi-story building that overlooks Turn 1 of the Speedway...

Cisco Systems—provider of high-tech products and services—relies on CESG to maintain their up-time...

CESG was awared the electrical contract for this 174,000 SF, 167 unit hotel in downtown Dallas, TX ...

We perform electrical service work at Raising Cane's locations throughout the D/FW Metroplex...