This addition to Stream’s Westover Hills data center in San Antonio, Texas, included servers for this 10,000 SF expansion that required 7.2 megawatts of electricity. This significant project included installation of a static switch, rework of existing electrical conduits, excavation of existing generator duct banks, and new chilled water pump electrical duct banks. The work also included installation of IMC conduit to complete raceway systems from utility transformers, generators, chiller water pumps and chillers to switchgear line-ups, OFCI UPS systems, and an Eaton 2000-amp bus duct system.
Location: San Antonio, Texas
Owner: Stream Data Centers
General Contractor: J.E. Dunn Construction
Completed: 2019