CESG was responsible for the electrical installation and fire alarm systems at this 10-story, 300,000+ SF office core and shell building with a four-level parking garage...
For the first time in the United States, an airline terminal was unitized and fabricated off site while the UG utilities and piers were being installed on site in an accelerated concourse delivery system. The High C gates had constraints on four sides that required...